Stormwater Drainage & Hydrology

Subdivision – Lots 9&10 Muriel Court Cockburn

Ground Civil Pty Ltd is proud to announce our latest subdivision project: Lots 9 & 10 Muriel Court, Cockburn Central, in collaboration with SJS Wealth Solutions Pty Ltd. This significant undertaking involves subdividing the land into 96 lots, including a Public Open Space (POS) area and upgrading Muriel Court. Ground Civil is honored to serve as the site superintendent, ensuring the highest standards of quality and efficiency. Stay tuned for more updates on this transformative development in the heart of Cockburn Central! Our Recent Projects

Subdivision – Lots 9&10 Muriel Court Cockburn Read More »

Land Utilisation – Vermont Grove Drainage Basin

    Land Utilisation – Vermont Grove Drainage Basin Ground Civil is proud to announce the successful completion of a stormwater drainage project for our client, Vermont Grove Pty Ltd. The project involved the design and construction supervision of a drainage basin on Lot 8 of Vermont Grove, a residential development in Madeley, Western Australia.

Land Utilisation – Vermont Grove Drainage Basin Read More »

YARA PILBARA NITRATES – DRAIN EXTENSION

YARA PILBARA NITRATES – DRAIN EXTENSION Ground Civil Pty Ltd (GC) has been engaged by KW Civil & Construction (KW Civil) to design existing drain extension and culvert crossing at Yara Pilbara Nitrate site, Burrup. Manning’s Equation was used to determine the flow rate with the following assumptions: Steady Flow – flow variables remain constant

YARA PILBARA NITRATES – DRAIN EXTENSION Read More »